1. <legend id="hqtmg"><i id="hqtmg"></i></legend>
        <optgroup id="hqtmg"><li id="hqtmg"></li></optgroup>

        <track id="hqtmg"></track>

        <track id="hqtmg"></track>
        <samp id="hqtmg"><em id="hqtmg"></em></samp>
        <span id="hqtmg"><blockquote id="hqtmg"></blockquote></span><small id="hqtmg"><output id="hqtmg"><rp id="hqtmg"></rp></output></small>
        輥道電機_輥道減速機_變頻電機_減速電機廠家_齒輪減速電機_傳動設備_齒輪減速機_制動電機 - 上虞德立齒輪減速電機有限公司
        久久99综合国产精品亚洲首页_九九在线精品亚洲国产_无码日韩精品一区二区久日AV_日韩乱码人妻无码系列中文字幕

          1. <legend id="hqtmg"><i id="hqtmg"></i></legend>
            <optgroup id="hqtmg"><li id="hqtmg"></li></optgroup>

            <track id="hqtmg"></track>

            <track id="hqtmg"></track>
            <samp id="hqtmg"><em id="hqtmg"></em></samp>
            <span id="hqtmg"><blockquote id="hqtmg"></blockquote></span><small id="hqtmg"><output id="hqtmg"><rp id="hqtmg"></rp></output></small>

            JiangSu JinPan Electrical CO.,LTD
            Address: Jiangsu Haian County Industrial Park
            Telephone: 0513-88890981
                               0513-88890982
            Fax:0513-88890388
            Contact: Yi sir
            Mobile phone: 15006271116

            News Center
            Your present position:Home>>News Center
             
            Promote power energy-saving emission reduction work management in distribution network operation
            【 Source: 】 【 Release time:2012-09-19 】 【 Typeface:Large In Small

                Beijing Chaoyang power supply in accordance with the " China State Grid Corp distribution transformer changing C project management approach " and the Beijing company, the company system in the 65 operation of transformer, the replacement for the new high efficiency transformer.
               
            In the implementation of the project, Beijing power supply company will transformer replacement work and autumn check combination of work, meticulous preparation of autumn check power plan, the establishment of project leading group, increase the project implementation supervision, a detailed record of replacing the link information. In the new transformer bidding procurement, replacing the implementation work link, strictly implement the relevant standards, efforts to shorten outage time, the implementation of the project to minimize the impact of customer.
                
            It is understood, CDM distribution transformer replacement after all, every year can save about 390000 kwh electricity, can reduce the no-load electricity consumption 1752 kwh, equivalent to reducing greenhouse emissions of about 97.5 tons. All renovation work is expected to be completed in October.
               
            " Distribution transformer replacement, to further promote the grid work, improve the distribution network operation management level. At the same time, the project development is helpful to show the enterprises to actively implement the national energy policy, and actively fulfill their social responsibilities, to promote sustainable economic and social development a good brand image. "

            Add time:2012-09-19  Browsing times:357



            JiangSu JinPan Electrical CO.,LTD
            Telephone:0513-88890981 Fax:0513-88890388 Address: Jiangsu Haian County Industrial Park Background log